Main

 > Home
 > Relocation Updates - monthly news
 > Construction Updates - for contractors
 > Press Releases
 > *New* Webcams - view the Concordia webcams, which update once a minute
 > RFPs/RFQs  - for contractors
 > Upcoming Events - special events     related to the new campus

Virtual Tour

 > Maps & Pictures - Explore the Hill      Country Reserve complete with pictures      and maps of the site
 > Aerial Video - video of the campus and      overview of the nature preserve
 > Environmental Conservation - details      on the nature preserve
 > Floor Plans - Detailed floor plans of the new site

Future

 > Master Site Plan - future development

Giving

 > Giving to Concordia - how to give to        Concordia online
 > Additional Giving Information

History

 > History Preservation - how we're      preserving campus history
 > The Road to the New Campus - how      we chose the Hill Country Reserve

Outside Links

Urban Growth Research
 > Envision Central Texas - growth      predictions
 > Campo Texas - how Austin is growing

Countdown to Concordia's relocation:

Panoramic View

Panoramic photo taken April 12, 2008 at Concordia's New Campus

A series of stitched together photographs taken April 12th, 2008 from the top of "Mt. Concordia" (the pile of excavated rock currently setting on top of the future baseball field).

The photo link above shows you a low-quality preview. Higher quality previews are available for download below:

Maps & Pictures

Click here to download a PowerPoint slideshow of pictures of the new campus. Click here to download the map with directions to the campus, or here to get directions from your location.
Click on the pictures to see a larger version:

Aerial shots

Helicopter for aerial shots of the west campus.jpg  Aerial shot March 12 - back side of Building B.JPG  Aerial shot March 12 - student housing looking north.JPG  Aerial shot March 12 - looking west.JPG  Aerial shot March 12 - wide shot looking west.JPG  Aerial shot March 12 - looking northeast.JPG  Aerial shot March 12 - student housing.JPG  Aerial shot March 12 - field house looking northeast.JPG  Aerial shot March 12 - looking northwest.JPG  Aerial shot March 12 - looking west at the fieldhouse.JPG  Aerial shot March 12 - looking west down central walkway.JPG  Aerial shot March 12 - view of exterior work between Buildings B & C.JPG  Aerial shot March 12 - fieldhouse roofing.JPG  Aerial shot March 12 - new main parking lot looking west.JPG  Aerial shot March 12 - looking north.JPG  Aerial shot March 12 - looking west over new construction.JPG  Aerial shot March 12 - student housing and water detention pond 3.JPG  Aerial shot March 12 - North Lamar property.JPG  Aerial shot of new construction Feb. 2.jpg  Aerial shot Nov 27 - looking north.jpg  Aerial shot Nov 27 - looking east.jpg  Aerial shot Nov 27 -  looking northwest.jpg 

Building B Renovation (Student Center & fine arts)

Bookstore finishes being put in.jpg  Bookstore finishes being put in (1).jpg  Bookstore finishes being put in (2).jpg  Preparations for installing an organ in one of the music classrooms.jpg  Framing of the new south entrance to Building B.JPG  Framing of the new south entrance to Building B (2).JPG  Framing of the new south entrance to Building B (3).JPG  Piers are installed for new south entrance on Building B.JPG  Steel workers install new south entrance on Building B.JPG  Lighting grid installed in the blackbox theater.JPG  Carpet goes into a portion of the student center.JPG  Steel workers install new south entrance on Building B (2).JPG  New exit door cut into the back of Building B.JPG  Carpeting in student government offices.JPG  Restroom work in Building B.JPG  New stairs and back entrance to Building B.JPG  Stucco being applied to old loading dock doors in Building B.JPG  New concrete stairs leading to Building B.JPG  Lighting grid installed in black box theater.JPG  Art studio cupboards installed.JPG  New south entry takes shape on Building B.JPG  Black Box light grid being installed.jpg  Building B New Entrance 3.jpg  Building B New Entrance 4.jpg  Building B New Entrance.jpg  Building B New Entrance 2.jpg  Bookstore.jpg  New south entrance being cut into Building B.JPG  Lighting in game portion of student center.JPG  Lighting goes in for the bookstore.JPG  Lighting being installed in main hallway.JPG  New cabinets arrive for the art studio.JPG  Work continues on the black box theater walls.JPG  Bookstore ceiling and lighting nears completion.JPG  New student government offices in Building B.JPG  The Black Box Theater starts to turn black.JPG  New front windows and door are being cut into Building B.JPG  Art studio being painted.JPG  Repair work continues on the tunnel between Buildings B & C.JPG  Ceiling grid being installed in the new bookstore.JPG  Ceiling grid being installed in main hallway in Building B.JPG  Lights being installed in the student center.JPG  Lighting being installed in the student center game area.JPG  Ceramic tile installation in the art restroom area.jpg  Ceiling being painted black in the new student center.jpg  Sanding the walls in the new student center.jpg  Ceiling grid installed in student government office.jpg  Work in the new student center in Building B.jpg  Sanding walls in a music classroom in Building B.jpg  Cutting an opening into an exterior wall on Building B.jpg  Building B black box theater area.jpg  Building B bookstore.jpg  Building B student center game room.jpg  Building B electrical work in student center.jpg  Building B tunnel renovation.jpg  Building B main hallway.jpg  Building B student center.jpg  Building B main entrance hall.jpg  Building B bookstore walls.jpg  Building B student center work.jpg  Building B art studio.jpg 

Building E Renovation (Cafeteria)

New accessible route by Building E.JPG  Repainting the cafeteria 2.jpg  Repainting the cafeteria 1.jpg  Cafeteria painting 3.jpg  Cafeteria painting 2.jpg  Cafeteria painting 1.jpg 

Building F Renovation (Library)

Reference section in the new library.JPG  Lower level of the new library.JPG  Future circulation desk takes shape.JPG  Back library workroom.JPG  Main stack area in the lower level.JPG  Reference section of the future library.JPG  Work continues on the circulation desk.JPG  Library workroom area.JPG  Lower level stack section gets ceiling grid.JPG  The main area on lower level where general stacks will be located.JPG  Plumbing work begins in the library.JPG  Circulation desk starts taking shape.JPG  Back of the circulation desk as it is being framed.JPG  One of three classrooms in the new library.JPG  New classroom framed in Building F.JPG  Future circulation desk in the new library.JPG  Lower level of the new library where stacks will go (1).JPG  Lower level of the new library where stacks will go (2).JPG  Walls starting to be installed in upper level of Building F.JPG  Lower level of Building F demolition nearing completion.JPG  Demolition of lower level (1).JPG  Demolition of lower level (2).JPG  Demolition of lower level (3).JPG  Upper level final demolition (1).JPG  Stairwell to the lower level of Building F.JPG  Upper level final demolition (2).JPG  Upper level final demolition (3).JPG  Upper level final demolition (4).JPG  Upper level final demolition (5).JPG  Upper level final demolition (6).JPG  Building F demolition 7.jpg  Building F demolition 6.jpg  Building F demolition 5.jpg  Building F demolition 4.jpg  Building F demolition 3.jpg  Building F demolition 2.jpg  Building F demolition 1.jpg  Building F demolition begins 2.jpg  Building F demolition begins.jpg 

Building G - Fieldhouse

Northwest side of the fieldhouse from the main parking lot.JPG  Glass windows being installed in the fitness center.JPG  Glass windows being installed in the fitness center (2).JPG  Windows installed on second floor of the fieldhouse overlooking the gym.JPG  Insulation completed in the gym section.JPG  Main vent ducts have been installed in the gym.JPG  Air ducts being installed in the gym.JPG